← All work

Case study · managed engineering · 2016 → today

Nine years inside someone else's peak season.

Bleckmann is a European fashion and lifestyle logistics provider. We have run the engineering and support behind business-critical parts of its operation since 2016 — including every Black Friday in that period, one of which passed a million and a half transactions.

Bleckmann European Logistics Mesh · Live Telemetry SRE Control Hub · Ghent · Swindon · Almelo · Venlo

1,520,410

Peak 24h Transactions (Held)

99.98%

SLA Execution (9-Year Avg)

38ms

Order Pipeline Latency

0

Peak Outages Across 9 Years

Continuous Deployment & Event Stream Architecture

● Multi-Agent Verification Active

Omnichannel Brands → Back-Pressure Buffer → .NET Core Ingestion Mesh → PHP Services & Rules → Automated CI/CD Gate → Warehouse Management System

The situation

Logistics software fails expensively and visibly. Orders do not flow, warehouses stall, brands lose a trading day they cannot get back. Bleckmann needed engineering that understood both the domain and the operational consequence — and support cover that did not depend on who happened to be awake.

The estate is a mix of .NET and PHP services built up over years, integrated with warehouse systems, carriers and client brands. It cannot be paused for a rewrite, and it has to absorb a load curve that goes near-vertical for one week a year.

What we own

Continuous integration and deployment, the release process, the .NET and PHP services behind it, DevOps and environments, monitoring, and a 24×7 support rota with tier-one resolution and a named escalation path. Nine years without a break in service, through staff changes on both sides.

Long engagements are their own discipline. Knowledge has to live in written context rather than in people's heads, or the ninth year becomes unmaintainable — which is exactly the practice that later made AI-assisted delivery straightforward for us.

Built for burst

Peak weekends are the test everything else is preparation for. Above one and a half million transactions in a single Black Friday, with capacity planned in advance, load paths rehearsed, and engineers on watch rather than on call.

Burst scale is not a feature you add in November. It is a set of decisions about queuing, idempotency, back-pressure and observability taken years earlier, and defended in every release since.

What changed with AI

The engagement now runs with AI assistance throughout — investigation, code, tests, documentation and change analysis — under the same review gates as before. Copilot and Claude sit inside the workflow; the architecture decisions, the release approvals and the accountability stay exactly where they were.

The practical effect is throughput: more change per month on a legacy estate, without a larger team and without a rise in incidents.

Nine years is the only claim that cannot be manufactured. Everything else about a supplier can be written well.

What it proves

Client

Bleckmann — fashion & lifestyle logistics, Europe

Engagement

Managed engineering and support, continuous since 2016

Our scope

CI/CD · release management · .NET and PHP services · DevOps · monitoring · 24×7 tier-one support

Peak load handled

1.5m+

transactions in a single Black Friday

Considering something similar?

We run managed engineering for a small number of clients at a time. If you have a system that has to work, we can usually tell you within thirty minutes whether we are the right fit.

Talk to an architect →